Introduction
A bathroom renovation is an exciting project that can add significant value to your home. Understanding the plumbing aspects helps you plan better.
The Renovation Process
Phase 1: Planning
- Design layout
- Select fixtures
- Get quotes
- Obtain permits if needed
Phase 2: Demolition
- Remove old fixtures
- Expose existing plumbing
- Assess pipe condition
Phase 3: Rough-In
- Install new pipe runs
- Position waste lines
- Install water supply points
- This is when the plumber does most work
Phase 4: Fit-Off
- Install fixtures
- Connect taps and toilets
- Test all connections
- Final adjustments
Plumbing Considerations
Moving Fixtures
Moving a toilet or shower is possible but costs more due to:
- Extended waste lines
- New water supply runs
- Floor modifications
Upgrading Pipes
Older homes may need:
- Replacement of galvanised pipes
- Upgraded water pressure
- New hot water connection
Compliance
All plumbing work must:
- Meet Australian standards
- Be done by a licensed plumber
- Be certified upon completion
Timeline
A typical bathroom renovation takes 2-4 weeks. The plumbing component usually requires:
- Day 1-2: Rough-in
- Final days: Fit-off
Conclusion
A successful bathroom renovation requires coordination between trades. R.K. Plumbing & Gas works seamlessly with builders and tilers to deliver quality results.